Preparing your NBMCA septic application.

The North Bay–Mattawa Conservation Authority reviews on-site sewage system applications across most of the Parry Sound and Nipissing districts. Seguin, McDougall, Perry, Armour and McMurrich/Monteith have reviewed their own since May 1, 2026, as the Township of the Archipelago always has — confirm which office covers your lot first. This working checklist helps you gather the drawings and supporting information for a complete submission.

Part one

The package

  • Application form, seven schedules, and fee

    The provincial Application for a Permit to Construct or Demolish, signed by the owner or by an agent with a signed Letter of Authorization, plus NBMCA's Schedules 1 through 7: designer information, installer information, site evaluation, design criteria, proposal to construct, site plan, and cross-section. Fee per the current NBMCA schedule — an application isn't processed until it's paid.

  • Site plan, drawn to scale, no larger than 11×17

    The scaled site plan should include:

    • Lot lines with dimensions, and lot area
    • All existing and proposed structures, including decks, sheds, and pools
    • Every well on the lot — and every well on neighbouring lots within the clearance radius, or a note that there are none
    • Lakes, rivers, streams, and wetlands by name, with the direction of surface water flow
    • Whether the shore road allowance is owned — if not, it's a lot line and setbacks run to it
    • Driveways, parking, and any area subject to vehicle traffic
    • Buried and overhead services, easements, and rights-of-way
    • Both test holes, the proposed system components, and proposed distances to the closest of everything above
  • Soils investigation and test holes

    A minimum of two test holes: one in the bed area as deep as the proposed system, one 15 m downslope in the direction of flow as deep as the mantle loading area. Document the soil description by horizon, depth to bedrock, seasonal high water table, and T-time to support the design assumptions.

  • Design sanitary sewage flow calculation

    Include the supporting calculation. For a dwelling, this uses bedroom count and fixture loading under Division B, Part 8 and accounts for all structures draining to the system, including a bunkie. Identify finished basements, lofts, and potential bedrooms consistently across the drawings and application.

  • Treatment unit specification

    Septic tank capacity and material for a Class 4 — residential tanks are sized at twice the daily design flow, 3,600 L minimum. For a system using a treatment unit, the make and model, its level of treatment, its BMEC or CAN/BNQ approval attached, and the required maintenance agreement.

  • Leaching bed design and calculations

    System type, area or trench length, T-time and loading rate used, distribution method, and the sizing calculation that connects the design flow to the area provided. Contact area and mantle loading area where the native soil needs them. Where fill is imported, the fill specification and the mantle extents.

  • Cross-section, to proposed depths

    A section through the bed showing existing and finished grade, topsoil, stone, filter medium, pipe spacing, contact area, side slopes, and separation to bedrock or water table. Show the proposed depths so the section describes the system being submitted.

  • Clearance distance table

    List each required clearance alongside the distance provided. A table gives the reviewer a clear reference to check against the site plan.

  • BCIN identification

    Include the designer name, BCIN, and qualification category, plus the design firm’s details where one is involved, on Schedule 1 and on the drawings. Confirm that registration information is current before submitting.

Part two

Six details to check before submitting

01

Wells on neighbouring properties

Include wells on adjacent properties within the applicable clearance distance, as well as those on your own lot, so the reviewer can check the proposed layout.

02

Bedroom count that doesn't match the building plans

Check that the septic and building permit applications use the same bedroom count and building information, even where they go to separate offices.

03

No reserve area shown

The replacement area has to exist, be usable, and be protected from traffic and construction. On a tight lot it needs to be designed for, not found afterward.

04

Soils information that doesn't support the loading rate

Confirm that the loading rate used in the calculations is supported by the test pit results and soil information.

05

Missing or vague fill specification

Imported material needs a defined specification that meets the design criteria. Include the supporting sieve analysis or filter graph required for review and inspection.

06

Current registration and insurance

Confirm that designer registration and required insurance are current when the application is submitted.

Practical note

Arrange test pits early in the process.

Soil depth and bedrock conditions influence system type, area, fill requirements, grading, and the available building location. Establishing those conditions early provides a sound basis for the layout.

Coordinating the site investigation with the excavator, designer, and inspector helps resolve questions before the design is developed.

This checklist is a general working reference, not a substitute for NBMCA's current submission requirements or the Ontario Building Code. Verify fees and forms against NBMCA directly before submitting.